Check out our new Hopper Car! Claywood Station

Claywood Group

Claywood Station

We build and manage trains.


SBB Ce 6/8 IIs at Claywood Station

Our trains are DETAILED, REALISTIC and TRUE TO SCALE.


Subsidiaries


News

Claywood Train Manufacturing Logo 2026-11-06

Rheingold Reworking in Progress

Claywood. The Rheingold is currently out of service and standing on one of Claywood’s building tracks. Its passenger cars have been disassembled and are being replaced with brand-new ones that will be more beautiful and even more realistic.

The locomotive - a German BR 18.4, also known as the Bavarian S 3/6 - has already been reworked and repainted in a more realistic livery, with a pine-green body and a red underframe. The repaint uses some of the newly added Locometal colors. In a few weeks, the train will be back on the tracks with a new route, which hasn’t been decided yet, and brighter colors that are as true to the original as possible in Minecraft.


Claywood Transport Logo 2026-10-25

Metronom has entered Service

Metronom Control Car

Claywood. The Metronom, a German double-deck passenger train, has entered service, providing a fast and reliable connection between Spawn and Claywood.
It consists of high-capacity coaches, some of which have multipurpose compartments. With varying entrance heights, the train can serve platforms of different heights.
Due to server-side issues, passengers can’t sit in the train at the moment. We hope to have this bug fixed soon.

View Train Line Details


Claywood Train Manufacturing Logo 2026-10-14

New Hopper Car completed

Hopper Car

Claywood. TWe’re happy to announce that series 001 of the Union Pacific Class H-70-1 hopper car is complete and available for purchase.
It was a 70-ton, three-bay open-top hopper car built to carry bulk materials such as coal, ore, sand, and gravel. These all-steel welded cars had bottom-dump doors for unloading and distinctive offset sides with vertical exterior bracing.
Its realistic, weathered appearance conceals a practical feature: 72 vault blocks, accessible through three portable storage interfaces beneath the car.

View Product


Claywood Transport Logo 2026-10-12

Train Chaos at Brassworks Spawn!

Spawn. At the moment, almost every active train on the server is stopped on the tracks leading to the Shopping District. It may be the greatest train jam in Brassworks’ history. Unlike most train jams, however, this one wasn’t cleared within hours. It wasn’t even an accident.
TehGizmoNator, the GSWR chief currently in charge of rebuilding work around spawn, is believed to be behind it. The map indicates that a second Spawn station may be under construction. The idea of building a secondary station for the Shopping District was raised some time ago, and players discussed whether it could reduce the burden on the main station, which has handled all train traffic until now.


Claywood Train Manufacturing Logo 2026-10-12

Train Assembly Tracks for Claywood Station

Claywood. Claywood Station has just gained three brand-new train-assembly tracks, which are already in use.
Claywood Train Manufacturing used to build trains and locomotives inside the station, on Platform 6. This caused several problems: it occupied one of the station’s tracks, put builders at risk while they worked beside an active track, and offered space for only one train at a time. The platform was also claimed by an allied party, which could have caused problems when it came to disassembling trains.
These factors led to the decision to build separate assembly tracks. Three tracks were built north of the station, with more space between them than between the station’s tracks. This also resolved the issue with the Metronom, which has been carefully moved to the new assembly tracks and can now be completed.
Along with the new tracks, many new signals were installed at the railway junctions near the station’s eastern and western entrances, and the track beds in those areas were completed.


Claywood Train Manufacturing Logo 2026-09-19

Metronom under Construction

Claywood. A train belonging to the German railway company Metronom is currently under construction at Claywood. The locomotive is already mostly finished, and one of the four planned carriages is nearly complete on the exterior as well.
When the train can be completed will depend on whether the claim-related issues currently preventing schematic work and train assembly can be resolved soon.
The new passenger train is intended to take over the line to Spawn, which is currently served by the Rheingold. The Rheingold will then be assigned to longer journeys across Brassworks.